Lock-up inspections in Cobbitty

The last look at the frame before plasterboard closes it for good.

  • Roof on, windows and external doors in, before any plasterboard
  • 1 to 2 hours on site
  • Report within 24 hours
Request a quoteLeave your details and an inspector rings you back today.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookRoof on, windows and external doors in, before any plasterboard
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Cobbitty lock-up (pre-plaster) inspection

  • Permanent posts under balcony and porch roofs
  • Studs cut or notched for services
  • Noggings present and nailed off
  • Trimming around openings and services
  • Window rubber flashings seated
  • Weep holes clear of mortar
  • Expansion joints left open for sealant
  • Stormwater pipes capped
  • Downpipes fitted on both levels
  • Render patches and damage
  • Excess mortar on brick faces
  • Safe access including scaffold stairs
Why it matters here

Lock-up (pre-plaster) inspections on Cobbitty builds

The most serious items we have recorded on Cobbitty lock-ups were structural and temporary at the same time: a front balcony roof still sitting on a temporary post, a stud cut through with no support added, noggings missing or loose. On one job the inspector also recorded the site as unsafe, with scaffolding but no safe stairs to reach the upper floor. All of it had to be resolved before plastering.

What we find at this stage in Cobbitty

  • Balcony roof on a temporary post
  • Studs cut through for services
  • Noggings missing or not nailed
  • Trimming still needed around openings
  • Scaffold without safe stair access
Trimming still needed before the plasterer arrives, found during a lock-up inspection in Cobbitty
Trimming still needed before the plasterer arrives
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Cobbitty

Annotated findings from Lock-up (pre-plaster) inspections.

Balcony roof supported by a temporary post with inadequate support, found during a lock-up inspection in Cobbitty
Balcony roof supported by a temporary post with inadequate support
Stud cut through and needing support before plaster, found during a lock-up inspection in Cobbitty
Stud cut through and needing support before plaster
Nogging in an internal wall not nailed off, found during a lock-up inspection in Cobbitty
Nogging in an internal wall not nailed off
Site recorded as unsafe with debris across the floor, found during a lock-up inspection in Cobbitty
Site recorded as unsafe with debris across the floor

The other stages of a Cobbitty build

  1. Bored piers inspection in Cobbitty1Bored piersHoles drilled and cages in, concrete not yet ordered
  2. Slab pre-pour inspection in Cobbitty2Slab pre-pourSteel tied and plumbing through, the day before concrete
  3. Frame inspection in Cobbitty3FrameFrame standing and trusses fixed, before wrap and roof sheeting
  4. Fixing inspection in Cobbitty5FixingLinings up, doors and joinery fitted, painter not yet in
  5. Waterproofing inspection in Cobbitty6WaterproofingMembrane cured in the wet areas and on balconies, tiler not yet started
  6. Pre-handover (PCI) inspection in Cobbitty7Pre-handover (PCI)Build complete, a fortnight or so before the handover date

All construction stage inspections in Cobbitty →

Guides

Construction stage guides for Cobbitty

All guides →

Book a lock-up (pre-plaster) inspection in Cobbitty

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Cobbitty: common questions

Why is a temporary post such a concern?

It was put there to hold the roof during construction, not for the life of the house. The permanent support has to be installed and checked before linings hide the connection.

What happens if a stud has been cut?

The builder adds support or replaces it to suit the load. It is simple while the wall is open and very hard once it is lined.

Will you inspect if the site is unsafe?

We inspect what can be reached safely and record anything we could not access and why. Safe scaffold access is the builder's responsibility.

How long does lock-up take?

Allow an hour or two, with double storey homes at the longer end.

Do you look at the brickwork as well?

Yes. Weep holes, mortar, expansion joints and rubber flashings at windows are all checked from outside.

Should items be fixed before plaster?

Yes. That is the whole point of this stage. We can come back to confirm before the plasterer starts.