Waterproofing inspections in Cobbitty

The membrane under the tiles, looked at before anyone tiles over it.

  • Membrane cured in the wet areas and on balconies, tiler not yet started
  • About 1 hour on site
  • Report within 24 hours
Request a quoteLeave your details and an inspector rings you back today.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane cured in the wet areas and on balconies, tiler not yet started
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Cobbitty waterproofing inspection

  • Membrane continuous over the whole floor
  • Pinholes and thin or missed patches
  • Upturn heights at walls and screens
  • Bond breaker width at internal corners
  • Puddle flange set at the right level
  • Penetrations for mixers and roses sealed
  • Balcony membrane into the overflow
  • Falls towards the outlet
  • Substrate clean and bonded
  • No timber reveals inside the shower
  • Damage from following trades
  • Step down depth at the doorway
Why it matters here

Waterproofing inspections on Cobbitty builds

Upstairs ensuites and tiled balconies are standard in new Cobbitty homes, and both sit over rooms you live in. When a membrane fails up there, the first sign is a stain on the ceiling below. On one Cobbitty job our inspector found a timber window reveal fitted inside the shower zone, which had to come out. Pinholes, a raised puddle flange and a balcony membrane that stops short of the overflow are the other items we see in the area.

What we find at this stage in Cobbitty

  • Pinholes and thin membrane patches
  • Puddle flange set above the floor
  • Timber reveals inside the shower zone
  • Balcony membrane short of the overflow
  • Bond breaker missing at corners
Bond breaker tape narrower than the membrane requires, found during a waterproofing inspection in Gilead
Bond breaker tape narrower than the membrane requires, Gilead
Sample findings

Sample defects found during our waterproofing inspections in Cobbitty

Annotated findings from Waterproofing inspections.

Timber window reveal inside the shower area to be removed, found during a waterproofing inspection in Cobbitty
Timber window reveal inside the shower area to be removed
Pinholes through the shower recess membrane, found during a waterproofing inspection in North Turramurra
Pinholes through the shower recess membrane, North Turramurra
Puddle flange set above the finished floor level, found during a waterproofing inspection in Gilead
Puddle flange set above the finished floor level, Gilead
Balcony membrane not taken into the overflow outlet, found during a waterproofing inspection in North Turramurra
Balcony membrane not taken into the overflow outlet, North Turramurra

The other stages of a Cobbitty build

  1. Bored piers inspection in Cobbitty1Bored piersHoles drilled and cages in, concrete not yet ordered
  2. Slab pre-pour inspection in Cobbitty2Slab pre-pourSteel tied and plumbing through, the day before concrete
  3. Frame inspection in Cobbitty3FrameFrame standing and trusses fixed, before wrap and roof sheeting
  4. Lock-up (pre-plaster) inspection in Cobbitty4Lock-up (pre-plaster)Roof on, windows and external doors in, before any plasterboard
  5. Fixing inspection in Cobbitty5FixingLinings up, doors and joinery fitted, painter not yet in
  6. Pre-handover (PCI) inspection in Cobbitty7Pre-handover (PCI)Build complete, a fortnight or so before the handover date

All construction stage inspections in Cobbitty →

Guides

Construction stage guides for Cobbitty

All guides →

Book a waterproofing inspection in Cobbitty

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Cobbitty: common questions

Why check waterproofing before tiling?

Once tiles are down the membrane cannot be seen. A fault found now is a touch up; found later it means removing tiles.

Do you check balconies as well as bathrooms?

Yes. Balconies over living areas get the same attention, including the overflow and falls.

Which standard applies?

AS 3740 for domestic wet areas, with the National Construction Code and the manufacturer's instructions for the membrane used.

How long is the visit?

Around an hour for a typical house with two or three wet areas.

What is a puddle flange?

The fitting at the floor waste that the membrane laps into. If it sits too high, water ponds around it instead of draining.

Can you test the membrane with water?

We inspect visually. Flood testing, where required, is arranged by the builder or waterproofer.

CallGet a Free Quote